1. Skip to content

Latest News

August, 2011

Edinburgh Festival Fringe

Edinburgh Festival Fringe

Posted: Tue, 30 Aug 2011 20:22

As part of the World's biggest entertainment festival we worked with Andy Cheeseman Productions on behalf of the BBC. EFS were asked to supply and install 875m² of Temporary Roadway for the site with an additional covering of 720m² green artificial grass for the front of stage areas. The product allowed the BBC to broadcast and entertain visitors.

Shambala Festival, Kelmarsh Hall

Shambala Festival, Kelmarsh Hall

Posted: Mon, 29 Aug 2011 12:48

The annual Shambala Music Festival takes place at Kelmarsh Hall in Leicestershire. For this year's festival, EFS were asked to provide 1060m² of Temporary Roadway to assist traffic for both around the site as well as hard standing for coaches and a further 500m² of Temporary Walkway for the toilet areas inside the festival.

Summer Sundae, Leicester

Summer Sundae, Leicester

Posted: Mon, 15 Aug 2011 18:41

For this 3 annual day music festival in Leicester we started with 250m² of aluminium roadway to allow for a flexible surface which would enable the stage construction to take place (cranes, lorries and fork lift trucks) without damaging the lawns of De Montfort Hall. After the stage construction we laid 1200m² of roadway around the site for walkways and buggy routes, additionally this was used for lorries and festival traffic to drive around the site.

Big Dip, Clapham Common

Big Dip, Clapham Common

Posted: Mon, 08 Aug 2011 15:33

Working on behalf of Total Swimming, British Gas and Speedo, we installed flooring for the biggest temporary swimming pool, beach pad and beach volley ball court. This involved 800m² of track way for the beach pad and a further 1400m² of bespoke blue artificial grass covering the pad and the surround pool. The event to support British Gas' sponsorship of British swimming was based in Clapham Common for 8 weeks.