1. Skip to content

Latest News

Wychwood Festival, Cheltenham Racecourse

Wychwood Festival, Cheltenham Racecourse

Posted: Thu, 07 Jun 2012 10:54

The Wychwood Festival is an annual musical festival held at Cheltenham racecourse featuring indie, folk and rock music. We were asked to provide and install 920m² of pedestrian walkway to protect the grounds from damage.

Tags: Temp-A-Path

Bang Goes the Theory Live, Edinburgh

Bang Goes the Theory Live, Edinburgh

Posted: Mon, 14 May 2012 07:10

This popular BBC television programme went live and interactive with an action packed stage show.  Having worked previously with the BBC and Andy Cheeseman Productions we were asked to lay 450m² of Temp-A-Path within the Turtle Structure for Evolution Dome, as part of this exciting event which was used by over 10,000 people and provided a huge focal point for the city at night.

MTV Titanic Sound Festival, Belfast

MTV Titanic Sound Festival, Belfast

Posted: Mon, 14 May 2012 07:08

This amazing event for Smallwood Music on behalf of Belfast City Council and the Northern Ireland Tourist Board was attended by over 16,000 people.  The MTV Presents Titanic Sounds! was a festival-style concert which took place against the beautiful backdrop of the iconic Titanic Belfast museum, as part of the city’s Titanic Festival to mark the centenary of the historic ship's launch.  The event featured acts including Olly Murs and Pixie Lott and helped to launch this fantastic new attraction on Belfast’s Albert Quay – birthplace of the Titanic.  With time as a premium we worked against the clock to install and then remove 3,800m² of Temp-A-Path for access and site management whilst protecting newly laid areas of turf and decking.

Mud Sticks

Mud Sticks

Posted: Wed, 21 Mar 2012 00:45

Even the best and well planned events can, and indeed do suffer from the British weather.

Tags: Hex Road, Temp-A-Path

LAMMA 2012

LAMMA 2012

Posted: Fri, 20 Jan 2012 11:03

LAMMA 2012 - UK's leading Agricultural Machinery, Equipment and Farm Services Show we supplied, installed and fitted our complete range of flooring solutions. The Hex Road product provided the ideal quick solution to link the established tarmac walkways with the temporary marquee based exhibition halls. Whilst providing excellent protection for the ground beneath, it also ensured a firm footing in the inclement January weather for the crowds over the 2 days. Temp-A-Path was supplied to over 20 companies to enable visitors to walk around the outdoor shows stands. Working with Blue Chip clients such as Claas and John Deere meant that the product was subject to high footfall during the event. Temp-A-Road was used by the show organisers to provide hard standing within one of larger temporary marquees. Once laid, the 2,000m² area then had stands constructed on to it, this quick and versatile solution both protected the showground whilst also allowing visitors a safe and comfortable passage through the assorted stands. As official suppliers of carpet for the stands we provided and installed a variety of colours and styles for use on both indoor and outdoor stands.

ATP Tennis, London O2 Arena

ATP Tennis, London O2 Arena

Posted: Thu, 05 Jan 2012 14:51

EFS were appointed by Ignite Europe to create the flooring within the Player's hospitality areas at the 2011 ATP Tennis Tournament in London's O2 Arena. This intensive work involved laying wood effect vinyl and carpets in the Players lounge and restaurant arenas. Bonding both items to the plywood flooring was technically challenging - yet completed in 2 days.

Lincoln Christmas Market, Lincoln

Lincoln Christmas Market, Lincoln

Posted: Tue, 06 Dec 2011 08:40

With over 350,000 visitors this year, Lincoln really is the biggest Christmas market. We laid over 2,500m² of Temp-A-Path to protect the grounds within the castle from the high footfall over the 4 days of the event and also critically during the site construction and dis-mantling.

Ludlow Medieval Christmas Fayre, Shropshire

Ludlow Medieval Christmas Fayre, Shropshire

Posted: Mon, 28 Nov 2011 12:45

Considered the "Best Medieval Fayre in the UK" we were asked to provide 1400m² of Temp-A-Path® in the castle grounds and a further 500m² of Hex Road as vehicle access to marquees. The market attracts over 100 stalls within the Castle grounds over the weekend.

Bury St Edmunds Christmas Market, Suffolk

Bury St Edmunds Christmas Market, Suffolk

Posted: Mon, 28 Nov 2011 12:12

For its 8th annual Christmas market we laid 1,400m² of Temp-A-Path for the stalls and entertainers as well as protecting the historic gardens

Nottingham University, UK

Nottingham University, UK

Posted: Mon, 03 Oct 2011 13:48

We have worked on site at Nottingham University throughout the summer with a selection of Graduation days, Open days and concluding with Freshers week. The work has included temporary roadways for car park access, marquee flooring along with all-purpose walkways and general flooring areas.

Edinburgh Festival Fringe

Edinburgh Festival Fringe

Posted: Tue, 30 Aug 2011 20:22

As part of the World's biggest entertainment festival we worked with Andy Cheeseman Productions on behalf of the BBC. EFS were asked to supply and install 875m² of Temporary Roadway for the site with an additional covering of 720m² green artificial grass for the front of stage areas. The product allowed the BBC to broadcast and entertain visitors.

Shambala Festival, Kelmarsh Hall

Shambala Festival, Kelmarsh Hall

Posted: Mon, 29 Aug 2011 12:48

The annual Shambala Music Festival takes place at Kelmarsh Hall in Leicestershire. For this year's festival, EFS were asked to provide 1060m² of Temporary Roadway to assist traffic for both around the site as well as hard standing for coaches and a further 500m² of Temporary Walkway for the toilet areas inside the festival.

Summer Sundae, Leicester

Summer Sundae, Leicester

Posted: Mon, 15 Aug 2011 18:41

For this 3 annual day music festival in Leicester we started with 250m² of aluminium roadway to allow for a flexible surface which would enable the stage construction to take place (cranes, lorries and fork lift trucks) without damaging the lawns of De Montfort Hall. After the stage construction we laid 1200m² of roadway around the site for walkways and buggy routes, additionally this was used for lorries and festival traffic to drive around the site.

Big Dip, Clapham Common

Big Dip, Clapham Common

Posted: Mon, 08 Aug 2011 15:33

Working on behalf of Total Swimming, British Gas and Speedo, we installed flooring for the biggest temporary swimming pool, beach pad and beach volley ball court. This involved 800m² of track way for the beach pad and a further 1400m² of bespoke blue artificial grass covering the pad and the surround pool. The event to support British Gas' sponsorship of British swimming was based in Clapham Common for 8 weeks.